Project concept:

Maximum integration of architectural objects into the surrounding natural landscape. Biomorphism of forms, blurring of boundaries between architecture and nature, flow of spaces.

Remote control of all systems of the complex, Smart-engineering, building innovations

 

Features of the project:

From the side of construction:

- application of the latest technologies for pile foundations for modular houses – 300 m²;

- construction of multi-storey biomorphic forms on reinforced concrete foundations – more than 6 000 m²;

- construction one of the largest outdoor vision pools in Eastern Europe on a 4-meter “floating” console using chlorine-free cleaning technology – 850 m³;

- laying the only unique fluorescent tracks in Europe based on BASF Elastopave coating with Emerald Yellow Ultra grade glow stone – 5000 l.m.

From the side of engineering:

Smart engineering: implementation of technologies for smart monitoring and control of all complex systems based on Siemens Desigo CC, Siemens WinCC, Siemens PXC, Siemens Synco KNX automation, namely:

- monitoring and management of the heating system, active/passive cooling;

- monitoring and management of the boiler room;

- monitoring and management of cooling and heating lines;

- monitoring and management of cleaning of filtration systems;

- monitoring and management of wells;

- monitoring of temperature conditions and moisture conditions of all premises;

- monitoring the work of NIBE heat pumps and Wilo pumps, etc.

- integrated user interface based on Crestron

- developed a security interface based on SATEL, AJAX, Siemens Cerberos

- a room management system based on SALTO has been developed

 

The following types of construction work were carried out at the facility:

- Engineering and geological surveys

- Topographic survey

- Soilworks: soil planning and development, soil tamping, soil compaction with crushed stone, pit digging, laying/backfilling of trenches, laying of cables, Rehau pipelines

- Foundation and monolithic works: formwork work, installation of a reinforced concrete foundation slab, walls erection/concreting, columns and overlapping curvilinear forms of two three-story buildings, construction of the structure of the retaining wall, work on the construction of the outdoor infinity pool bowl structure with a volume of 850 m³, construction of a boathouse

Road works:

construction of pedestrian paths covered with Elastopave polyurethane coating with glowing stone Emerald Yellow Ultra grade, construction of passenger vehicles paths using BASF technology.

- Preparation of pile-screw foundation for modular houses

- Works on shore fortification

- Drilling artesian wells

- Installation of the grounding system, lightning protection

- Installation of heating and cooling lines

- Roofing

- Laying deck boards

- Installation of floor subfloors, screeds, laying of communications

- Work on the preparation of the base floor, walls: installation of floor screeds, incl. dust removal, installation of self-levelling screeds, installation floors and walls’ heat and waterproofing, installation walls’ vertical waterproofing

- Irrigation systems installation

- Lawn laying

Finishing works:

- Soundproofing of premises

- Filling door/window openings of an irregular, complex shape

- Laying wall and ceiling tiles

- Laying flooring: laminate, decking, tiles

Electrical works:

- Installation of low-current systems: SCN, ACS, Smart office, WiFi, security alarm system, fire alarm system, incl. fire extinguishing system

- Cable routing

- Installation of lighting equipment

- Installation and assembly of panels and input-distribution devices

- Assembly of MDB

- Connection of automation systems

- Installation of the external video surveillance system

  • 0
    m³ of soil has been excavated
  • 0
    tons of reinforcement have been installed
  • 0
    m³ of concrete poured
  • 0
    m³ of water has been filled

Сharacteristics

  • Rehau pipes have been laid 5000 l.p.
  • rolled lawn has been laid 3700 м2
  • fluorescent stones have been covered 1200 м2
  • solar panels have been installed 2 000 м2