About project
Project concept:
The K3 office for the fast-growing Ukrainian IT company MacPaw is an organic continuation and expansion of the K2 project. As a result of the work we performed, a freer layout of working spaces, fresh, technological and bright elements of work and visual zoning appeared.
Features of the project:
- Exclusive solutions and high-quality wear-resistant materials have been used in the project
- An integrated complex of engineering networks has been designed, including power supply, heating, ventilation and smart-office systems
- Several functional meeting rooms with electrochromatic glass partitions, marker and magnetic walls, and 80-inch LED panels
- Own fitness centre of professional level was created, as well as a room-studio for parties
- Wide use of decorative materials Armourcoat and Oddicini
The following work has been completed:
- general construction: grinding and dedusting of concrete floors, walls, coating with water-emulsion compounds, soundproofing of premises
- construction and installation: dismantling of existing brick partitions, installation of plasterboard partitions, brick partitions, production and installation of curvilinear glass partitions
- flooring installation: laying hexagonal carpet tiles, ceramic tiles, antistatic coatings in special-purpose rooms
- decorative wall finishing, preparation and finishing of walls for painting, painting walls
- manufacturing and installation of individual wooden products
- electrical installation work: laying cables, installing lighting equipment, installing long designer lighting fixtures, installing floor hatches, installing switchboards and input distribution devices
- plumbing works: laying of water pipes, sewage and heating, incl. installation of pressure sewerage
- installation of heating devices: convectors, radiators, underfloor heating (water and electric)
- installation of plumbing equipment
- installation of air conditioning and ventilation systems
- installation of low-current systems: SCN, ACS, smart office, security alarm system, fire alarm system, incl. fire extinguishing system, fire notification, installation of the dispatching system
-
0DALI lamps
-
0mosaic carpet slabs
-
0meters of ventilation ducts
-
0Sololift pumps
Сharacteristics
- Armourcoat coating 380 м2
- Light scenarios 35
- Oddicini panels 50
- Apple computers 70