Our projects
- All
- Apartments and houses
- Offices
- HoReCa



MacPaw – K2
- Year 2014
- Area1114 м2
- CustomerMacPaw
- DesignBaraban+
- StyleHi-tech
About project
Project concept:
Implementation of the design project of the head office of the Ukrainian IT company MacPaw.
Design idea: Microchip as the basis of IT technology. Thanks to smart zoning, it was possible to create a comfortable atmosphere for work and rest.
Features of the project:
- 45 m² of electrochromatic glass partitions have been installed
- Wide use of marker and magnetic paints
- Production of individual elements of decor and furniture
- Lighting, climate control, sound system, as well as many other systems inside the office can be controlled from an iPhone or iPad
- A relax terrace with a golf course and a fountain was created
- Carefully selected finishing materials made it possible to achieve high functionality, wear resistance and ergonomics of the office
The following work has been completed:
- general construction: grinding and dedusting of concrete floors, walls, dismantling of existing brick partitions, installation of floor screeds, installation of self-levelling screeds, installation of heat and waterproofing, installation of communications (heating, electricity, water supply and sewage systems), raised floors installation
- construction and installation: plasterboard partitions, brick partitions, smart glass partitions, production and installation of all-glass partitions
- installation of floor coverings: laying carpet, ceramic tiles, laying antistatic coverings in special-purpose premises
- installation on the Terrace of a seamless Gumibo rubber coating, artificial grass, laying of a terrace board
- wall finishing: painting, decorative finishing of high complexity
- filling of doorways
- installation of outdoor sun protection awnings on the Terrace
- electrical installation work: laying cables, installation of lighting equipment, installation of lighting fixtures, installation of panels and input-distribution devices
- plumbing works: laying of water pipes, sewage, incl. installation of pressure sewerage
- installation of heating devices: convectors, radiators, underfloor heating (water and electric)
- installation of plumbing equipment
- installation of air conditioning and ventilation systems
- installation of low-current systems: SCN, ACS, smart office, security alarm system, fire alarm system, incl. fire extinguishing system, fire notification, installation of the dispatching system of engineering systems
-
0meters of low-current and power cables
-
0Kingspan raised floor slabs
-
0exclusive LED lamps
-
0liters of magnetic and marker paint
Сharacteristics
- Open terrace with fountain 250 м2
- SMART glass panels 100 м2
- Room for cats:) 30 м2
- Own sports hall 150 м2
Gallery













