Our projects
- All
- Apartments and houses
- Offices
- Horeca
![MacPaw - K3](/en/assets/components/phpthumbof/cache/4.41d3708c65ab78ed954864a573317ce1.jpg)
![Representative office of Xinwei Holding](/en/assets/components/phpthumbof/cache/8.dc09212234da69f21bdc8889a890ebc5.jpg)
![MacPaw - K2](/en/assets/components/phpthumbof/cache/16.cd578323c2b206ad74d4eba8e934bd35.jpg)
![DV Bank](/en/assets/components/phpthumbof/cache/5.a4d6e560b72258cd3477891ff3bb47ca.jpg)
MacPaw - K3
- Year 2016
- Area1000 м2
- CustomerMacPaw
- DesignBaraban+
- Stylehigh-tech
About project
Project Concept:
K3 office for fast-growing Ukrainian IT company MacPaw is an organic continuation and extension of the K2 project. As a result of our work, there is a freer layout of working spaces, fresh, technological and bright elements of working and visual zoning.
Project features:
- Exclusive solutions and quality wear-resistant materials were used in the project
- An integrated complex of engineering networks including power supply, heating, ventilation and smart-office systems has been designed.
- Several functional meeting rooms with electrochromatic glass partitions, marker and magnetic walls, and 80-inch LED-panels.
- Created an in-house professional-grade fitness center as well as a party studio room
- Extensive use of Armourcoat and Oddicini decorative materials
The following work was performed:
- general construction: grinding and dedusting of concrete slabs, walls, floors, coating with water emulsion compositions, soundproofing of rooms
- construction and installation: dismantling of existing brick partitions, installation of gypsum cardboard partitions, brick partitions, manufacturing and installation of curved glass partitions.
- arrangement of flooring: laying of hexagonal carpet tiles, ceramic tiles, antistatic coatings in special-purpose rooms
- decorative finishing of walls, preparation and finishing of walls for painting, painting of walls
- manufacturing and installation of individual wood products
- electrical works: cable laying, installation of lighting equipment, installation of long designer lighting fixtures, installation of floor hatches, installation of switchboards and input distribution devices
- plumbing works: laying of water supply, sewerage and heating, including installation of pressure sewerage.
- installation of heating devices: convectors, radiators, warm floors (water and electric)
- installation of sanitary equipment
- installation of air conditioning and ventilation systems
- installation of low-current systems: SCS, ACS, smart office, security alarm system, fire alarm system, including fire extinguishing system, fire alarm notification, installation of dispatching system.
-
0DALI luminaires
-
0mosaic carpet tiles
-
0meters of ventilation ducts
-
0Sololift pumps
Сharacteristics
- Armourcoat coatings 380 м2
- Light scenarios 15
- Oddicini panels 50
- Apple computers 70
Gallery
![k3_1](assets/uploads/MacPaw_K3/7.jpg)
![k3_2](assets/uploads/MacPaw_K3/6.jpg)
![k3_3](assets/uploads/MacPaw_K3/12.jpg)
![k3_4](assets/uploads/MacPaw_K3/13.jpg)
![k3_5](assets/uploads/MacPaw_K3/17.jpg)
![k3_6](assets/uploads/MacPaw_K3/18.jpg)
![k3_7](assets/uploads/MacPaw_K3/21.jpg)
![k3_8](assets/uploads/MacPaw_K3/23.jpg)
![k3_9](assets/uploads/MacPaw_K3/5.jpg)
![k3_10](assets/uploads/MacPaw_K3/8.jpg)
![k3_11](assets/uploads/MacPaw_K3/10.jpg)